How to install the herringbone parquet flooring ?
1. Prepare the subfloor: Inspect the subfloor to ensure it is level, flat, clean, and dry. If necessary, use a self-leveling compound to make the subfloor level. 2. Lay out the pattern: Begin by laying out the pattern of the herringbone flooring. Measure the room, and then use a chalk line to create a grid of the herringbone design. 3. Install the parquet tiles: Start in the corner of the room and begin laying the parquet tiles. Make sure to